221129000499 - PROPOSED HDF ENERGY RENEWSTABLE SWAKOPMUND HYDROGEN-TO-POWER PROJECT

ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES 1. The construction of facilities for - (a) the generation of electricity; (b) the transmission and supply of electricity; LAND USE AND DEVELOPMENT ACTIVITIES 5.1 The rezoning of land from - (a) residential use to industrial or commercial use; (b) light industrial use to heavy industrial use; (c) agricultural use to industrial use; and (d) use for nature conservation or zoned open space to any other land use. WATER RESOURCE DEVELOPMENTS 8.6 Construction of industrial and domestic wastewater treatment plants and related pipeline systems. 8.12 The release of brine back into the ocean by desalination plants. HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE 9.3 The bulk transportation of dangerous goods using pipeline, funiculars or conveyors with a throughout capacity of 50 tons or 50 cubic meters or more per day. 9.4 The storage and handling of a dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. 9.5 Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin. INFRASTRUCTURE 10.1 The construction of- (a) oil, water, gas and petrochemical and other bulk supply pipelines;

Prpject status APPROVED

For further information contact:

Ministry of Environment and Tourism

Department of Environmental Affairs

(+264 -61) 284 2701 (T)

(+264-61) 240 339 (F)

http://www.met.gov.na