THE ECC IS REQUIRED TO UNDERTAKE THESE ACTIVITIES: 1) REZONING OF THE 50 000 SQUARE METERS (ABOUT 5 HECTARES) OF LAND ALLOCATED FOR THE FACTORY FROM UNDETERMINED TO INDUSTRIAL. 2) CONSTRUCTION OF THE FACTORY BUILDINGS AND ASSOCIATED INFRASTRUCTURE (BOUNDARY FENCING, WATER RETICULATION, INTERNAL FACTORY ROUTES, SEWERAGE, ELECTRICITY CONNECTIONS INCLUDING ALTERNATIVE ENERGY SOURCES SUCH AS SOLAR POWER, ETC). 3) MANUFACTURING OF CLAY BRICKS AND ROOFING TILES INCLUDING STORAGE OF RAW MATERIALS, STORAGE OF BULK FUEL (20 000 LITRES IN AN ABOVEGROUND FUEL STORAGE TANK), STORAGE OF SOLID FUEL (COAL, CHARCOAL, BIOMASS OR WOODCHIPS) USED IN THE FIRING OF PRODUCTS.
Prpject status APPROVED